HOME  »  Legeros Fire Photos » January 27, 2013 - Lakestone Drive  (180 Slides)     [Page 1 of 10] :: Jump To  
  You have reached the first page You have reached the first page      Up one level      Next page Last page  

January 27, 2013 - Raleigh FD & Wake EMS - Lakestone Drive


2013-01-27-rfd-lakestone-dr-mjl-001
2013-01-27-rfd-lakestone-dr-mjl-002
2013-01-27-rfd-lakestone-dr-mjl-003
  2013-01-27-rfd-lakestone-dr-mjl-001  
  2013-01-27-rfd-lakestone-dr-mjl-002  
  2013-01-27-rfd-lakestone-dr-mjl-003  
2013-01-27-rfd-lakestone-dr-mjl-004
2013-01-27-rfd-lakestone-dr-mjl-005
2013-01-27-rfd-lakestone-dr-mjl-006
  2013-01-27-rfd-lakestone-dr-mjl-004  
  2013-01-27-rfd-lakestone-dr-mjl-005  
  2013-01-27-rfd-lakestone-dr-mjl-006  
2013-01-27-rfd-lakestone-dr-mjl-007
2013-01-27-rfd-lakestone-dr-mjl-008
2013-01-27-rfd-lakestone-dr-mjl-009
  2013-01-27-rfd-lakestone-dr-mjl-007  
  2013-01-27-rfd-lakestone-dr-mjl-008  
  2013-01-27-rfd-lakestone-dr-mjl-009  
2013-01-27-rfd-lakestone-dr-mjl-010
2013-01-27-rfd-lakestone-dr-mjl-011
2013-01-27-rfd-lakestone-dr-mjl-012
  2013-01-27-rfd-lakestone-dr-mjl-010  
  2013-01-27-rfd-lakestone-dr-mjl-011  
  2013-01-27-rfd-lakestone-dr-mjl-012  
2013-01-27-rfd-lakestone-dr-mjl-013
2013-01-27-rfd-lakestone-dr-mjl-014
2013-01-27-rfd-lakestone-dr-mjl-015
  2013-01-27-rfd-lakestone-dr-mjl-013  
  2013-01-27-rfd-lakestone-dr-mjl-014  
  2013-01-27-rfd-lakestone-dr-mjl-015  
2013-01-27-rfd-lakestone-dr-mjl-016
2013-01-27-rfd-lakestone-dr-mjl-018
2013-01-27-rfd-lakestone-dr-mjl-019
  2013-01-27-rfd-lakestone-dr-mjl-016  
  2013-01-27-rfd-lakestone-dr-mjl-018  
  2013-01-27-rfd-lakestone-dr-mjl-019  
  You have reached the first page You have reached the first page      Up one level      Next page Last page  

RALEIGH - Working fire at 122 Lakestone Drive. Engine 9 arriving with smoke showing from the roof of the two-story semi-detached garage, connected on one story with a two-story single-family dwelling. Built 1972 with 3,871 square-feet. Second story of garage fully furnished. Challenges included long lay from hydrant (about 590 feet) and distance from street to garage (about 130 feet). Crews took a line into the garage, while ventilation was also started. Crews withdrawn from inside and atop garage, due to deteriorating roof conditions. Trench cut made on structure connecting house and garage. Defensive operations started, including with Ladder 2 flowing from street. Dispatched 12:53 p.m. Controlled 1:40 p.m. No injuries, occupants escaped unharmed. Cause determined as accidental. Units on scene included E9, E6, E11, E16, L2, R3, B1, B4, A1, C10, C20, C40, EMS _, EMS _, D1. "C" platoon Mike Legeros photographs.


Album last updated on 1/29/13 6:42 PM
Powered by jAlbum 10 and BluPlusPlus skin
Copyright Mike Legeros 2013