HOME  »  Legeros Fire Photos » June 16, 2013 - Beryl Road  (203 Slides)     [Page 1 of 12] :: Jump To  
  You have reached the first page You have reached the first page      Up one level      Next page Last page  

June 16, 2013 - Raleigh FD & Wake EMS - Beryl Road


2013-06-16-rfd-beryl-rd-mjl-001
2013-06-16-rfd-beryl-rd-mjl-002
2013-06-16-rfd-beryl-rd-mjl-003
  2013-06-16-rfd-beryl-rd-mjl-001  
  2013-06-16-rfd-beryl-rd-mjl-002  
  2013-06-16-rfd-beryl-rd-mjl-003  
2013-06-16-rfd-beryl-rd-mjl-004
2013-06-16-rfd-beryl-rd-mjl-005
2013-06-16-rfd-beryl-rd-mjl-006
  2013-06-16-rfd-beryl-rd-mjl-004  
  2013-06-16-rfd-beryl-rd-mjl-005  
  2013-06-16-rfd-beryl-rd-mjl-006  
2013-06-16-rfd-beryl-rd-mjl-007
2013-06-16-rfd-beryl-rd-mjl-008
2013-06-16-rfd-beryl-rd-mjl-009
  2013-06-16-rfd-beryl-rd-mjl-007  
  2013-06-16-rfd-beryl-rd-mjl-008  
  2013-06-16-rfd-beryl-rd-mjl-009  
2013-06-16-rfd-beryl-rd-mjl-010
2013-06-16-rfd-beryl-rd-mjl-011
2013-06-16-rfd-beryl-rd-mjl-012
  2013-06-16-rfd-beryl-rd-mjl-010  
  2013-06-16-rfd-beryl-rd-mjl-011  
  2013-06-16-rfd-beryl-rd-mjl-012  
2013-06-16-rfd-beryl-rd-mjl-013
2013-06-16-rfd-beryl-rd-mjl-014
2013-06-16-rfd-beryl-rd-mjl-015
  2013-06-16-rfd-beryl-rd-mjl-013  
  2013-06-16-rfd-beryl-rd-mjl-014  
  2013-06-16-rfd-beryl-rd-mjl-015  
2013-06-16-rfd-beryl-rd-mjl-016
2013-06-16-rfd-beryl-rd-mjl-017
2013-06-16-rfd-beryl-rd-mjl-018
  2013-06-16-rfd-beryl-rd-mjl-016  
  2013-06-16-rfd-beryl-rd-mjl-017  
  2013-06-16-rfd-beryl-rd-mjl-018  
  You have reached the first page You have reached the first page      Up one level      Next page Last page  

RALEIGH - Commercial structure fire at 4001 Beryl Road. Dispatched as fire alarm. Engine 8 arriving at a one-story brick industrial building with 22,543 squaree-feet. Built 1974. Smoke showing from roof vents. Remaining structure fire assignment and working fire assignments dispatched. Presence of hazardous materials also noted. Crews made entry and located fire(s) burning in chemical vat(s). Heavy smoke conditions inside, requiring ventilation that included Ladder 4 to roof. Personnel withdrawn from inside, while situation was assessed. Haz-mat units also responded, to assist with evaluating situation. Dry-chemical extinguishers brought into structure, as initial extinguishing agent. Personnel also outfitted with special boots. All interior crews also decontaminated. Water run-off from inside building also contained. Command post, rehab, personnel, and staged units moved west on Beryl Road, to be upwind of smoke. Dispatched about 3:22 p.m. Controlled about 5:23 p.m. Crews remained on scene into the evening, with units returning to the scene to assist with overhaul and investigation. Units on scene included E8, E5, E6, E20, L7, L4, R1, Sq14, B3, B5, A1, C20, C420, C401, C14 (safety), C5, C1, HM1, HM2, SR3, C55 (haz-mat), EMS 4, EMS 8, D1, T1. "A" platoon. Mike Legeros photographs.


Album last updated on 6/23/13 3:19 PM
Powered by jAlbum 10 and BluPlusPlus skin
Copyright Mike Legeros 2013