08/19/09 75 W, 1 I - + 12 - 3 Load In


Terminology used in event booking. Refers to the time that performers or exhibitors can start carrying their equipment into the venue. Pictured is Morrisville Engine 3 and another unit queued for entry into the lower level of the convention center. Apparatus with water are required to empty their tanks before entry. Support trucks and supply vans also use this entrance. And it was hot as hell outside.
 





See more photos, http://www.legeros.com/ralwake/photos/20..
Legeros - 08/20/09 - 06:27

This is a very cool photo. I love this shot. A unique view of the city.
Ginny (Email) (Web Site) - 08/20/09 - 13:49

How much fuel were these trucks allowed to have on-board?
Olson - 08/21/09 - 08:48

Less than 1/4.
jeff - 08/21/09 - 14:35

I heard there is a staircase inside the cab to get the top of that morrisville rig.
ha! - 08/24/09 - 16:48



  
Remember personal info?

/ Textile

Comment moderation is enabled on this site. This means that your comment will not be visible on this site until it has been approved by an editor.

To prevent spam we require you to answer this silly question
 

  (Register your username / Log in)

Notify:
Hide email:

Small print: All html tags except <b> and <i> will be removed from your comment. You can make links by just typing the url or mail-address.