04/07/14 244 W, 1 I - + 3 - 4 This Morning's Postal Facility Fire


Have a few details about this morning's postal facility fire at 1 Floretta Place, the main postal distribution center in Raleigh. The fire, reported after midnight, started in a package sorting area, in a package sorting cart. Witnesses said they heard a "pop" before the fire started. It was quickly extinguished, though several packages were destroyed. Officials are saying that it appears there was a chemical reaction in a package, perhaps from a battery or some type of chemical.

The incident was dispatched at 12:03 a.m. as an explosion and fire (with haz-mat assignments added later?). Engine 23 was first on scene at the one-story, concrete and steel building with 351,250 square-feet. Built 1994. They stretched a single line inside and extinguished the small fire. The building was briefly evacuated, with 155 workers inside at the time of the fire. No injuries were reported, though a number of employees were evaluated by EMS. 

Fire units on scene included E23, E24, L6, B3, B4, C20, C401 (investigator), HM1 (staffed by E2), HM2 (staffed by E27), HM3 (recon unit staffed by E8), HM4 (decon unit staffed by L5), Durham Highway P1, R5. Medical units on scene included EMS 22, EMS 38, EMS 6, EMS 7, D4, D3, M91, T1. Other agencies included Raleigh PD, Wake County EM, and ATF. See a handful of photos from Jason Thompson, including the one below.

Sources include:


Jason Thompson photo





The Postal Inspector was also there.
The One - 04/07/14 - 20:41



  
Remember personal info?

/ Textile

Comment moderation is enabled on this site. This means that your comment will not be visible on this site until it has been approved by an editor.

To prevent spam we require you to answer this silly question
 

  (Register your username / Log in)

Notify:
Hide email:

Small print: All html tags except <b> and <i> will be removed from your comment. You can make links by just typing the url or mail-address.